PROJECT

DCAM E-commerce development project will be tailored around the needs of the occupier. As presented, it adopts an innovative car parking solution, allowing better utilisation of land while creating an improved traffic flow.

Project Scope

  • State of the art logistics facility
  • Warehouse capacity over 80,000 m2 (depending on design)
  • Modular warehouse space
  • Innovative car parking solution, allowing for up to 600 parking spaces
  • Efficient traffic flow to allow easy circulation around the building

Warehouse Overview

  • Free storage height of 12.2 m
  • Column span of 23 m (optimised for both narrow and wide aisle racking configurations)
  • One loading dock per 850 m2 of warehouse space
  • Automated electric doors on ground floor level (4 m x 4.2 m)
  • Average floor load capacity of 5,000 kg/m2 with maximum point load of 80 kN
  • Flatness floor according to DIN 18202 Tabel 3, Zeile 4
  • Certified ESFR sprinkler installation according to NFPA
  • Fire hose reels, fire alarm and evacuation system
  • LED lights equipped with dynamic dim function, delivering 300 Lux at 1.5 m
  • Charging station for lift trucks – 1 station per 1,000 m2 of warehouse

Timetable

  • All necessary ground preparations are completed
  • Construction works can be scheduled to commence in line with client requirements
  • During the last two months of construction, DCAM can offer early access for fitting out works prior to lease commencement